1'495'000
CHF1'495'000
Last attic apartment, located in building "H", bright and benefiting from a large, very intimate balcony. The net interior area is 106 m2. The construction site for this building opened in mid-August 2026 and is scheduled for delivery in the summer of 2028. I leave it to you to read the text below to better understand the philosophy of the project.
In an 18,000 m2 park located south of the Ecublens commune, on the Saint-Sulpice side, in close proximity to EPFL, the Domaine de La Vignette is a new construction project consisting of nine buildings with three and four-room apartments. The buildings have only one floor above the ground floor. The three top buildings (A B C) are dedicated to rental, the other six (D to I) to ownership per floor. The construction site opened on October 11, 2024. The quality of the construction is exceptional in terms of building materials and interior finishes. Particular attention has been paid to the exterior amenities. The park contains over seventy major trees as well as numerous indigenous plantations. The philosophy of the project is to live in a place where the surrounding nature and the large trees confer tranquility. The parking spaces are all located in the basement with direct access to each building. A communal room of eighty square meters is made available to residents for various activities. Energy production is achieved for each building using a high-end geothermal heat pump from the Stiebel Eltron brand, as well as thermal panels that relieve the heat pump and the natural resources of the land, especially in summer. A simple flow system optimizes the air quality in the apartments. The extracted heat is redirected to the heat pump. The construction is labeled "Minergie". The buildings also benefit from the "RCP" system, which means own consumption billing, i.e. the generated electricity is first used by the common areas and then by the private areas before being fed into the grid. A Free-Cooling system, "summer cooling of the apartments", complements the many advantages of this project. I thank you for your reading and wish you a beautiful day. Dominique Baldi
Chemin des Clos 49 1024 Ecublens
Loading…
ARE transit class C — usable but limited service.
85% built-up area within 500 m.
Many households of three or more · around 34 people in the neighbourhood.
62.5 %
Lower than 83% of municipalities in the canton
ESTV · 2026
CHF 13'955 income tax a year · Single person without children, gross wage CHF 100'000
South-west side: a fair amount of sun, in winter too
This is about the building's façades, with the shade of neighbouring buildings and the terrain. How much of it reaches a flat depends on the floor and the windows.
As of 2015
Source: Swiss Federal Office of Energy SFOE
Road and rail noise in the surroundings
Calculated from the federal noise model: the mean over the hectare (100 × 100 m) of the surroundings, model year 2021.
Night
36 dB
Loudest source
Road
Calculated level, placed on a scale of everyday sounds.
At least one pollutant is above its WHO guideline; all meet the Swiss limit.
The federal radon map estimates that 2 to 10% of the buildings here exceed the reference value of 300 Bq/m³.
In at most 10% of the buildings around
In the network models of 3 operators.
Mobile: as of 2026