CHF1'250'000
Oberdorfstrasse 24, 8274 Tägerwilen
As of 07 Sept 2026
The asking price is 5% above the median of .
This listingCHF 1'250'000
CHF 1'190'000
Median
Is there room to negotiate?
A typical listing stays on the market for about 26 days. 1.1% of active listings have cut their asking price in the last 90 days. Asking prices per m² are about 0.1% lower than a month ago.
ARE transit class C — usable but limited service.
66% built-up area within 500 m.
Mostly singles · around 57 people in the neighbourhood.
118 %
Lower than 92% of municipalities in the canton
ESTV · 2026
Times refer to the route on foot.
noise level by day
Quiet location
Hardly any road, rail or air traffic noise.
Night
33 dB
Loudest source
Road
Quieter than 75% in the canton
Measured noise level, placed on a scale of everyday sounds.
Pollutant levels are below the WHO guideline.
Hardly any elevated radon levels in the area.
Most buildings
Available from 3 networks.
Julian Fischbacher
Living on the Allmendbach - 8 unique owner-occupied apartments in Tägerwilen On Oberdorfstrasse 24, along the Allmendbach and adjacent to a forest area, a total of 8 unique owner-occupied apartments with attractive views of the surrounding countryside are being built. The apartments comprise 4.5 to 5.5 rooms and are distributed over four floors, with two apartments per floor. The basement contains a underground garage with 13 parking spaces.The project combines natural living with modern comfort: Two spacious garden apartments on the ground floor offer a direct connection to nature, while the attic apartments are designed as bright loft apartments with a gallery and an impressive double-height room. All units have a private outdoor area such as a balcony, terrace, or garden.The building permit has been granted - the project is taking concrete shapeApartment overview:Ground floor south: AvailableGround floor west: (Reserved)1st floor west: Reserved1st floor south: Available2nd floor west: Reserved2nd floor south: AvailableLoft west: (Reserved)Loft south: AvailableConstruction start and move-in:The project has been approved. Construction will begin in autumn/winter 2026. Move-in is planned for autumn/winter 2028.Your new home is waiting for you!We are available to provide further information at any time. Don't miss this unique opportunity and contact us today.