CHF95'000
1996 Brignon (Nendaz)
ARE transit class D — a car is needed for most trips.
86% green and natural space within 500 m.
Mostly singles and couples · around 3 people in the neighbourhood.
130 %
Lower than 28% of municipalities in the canton
ESTV · 2026
Times refer to the route on foot.
noise level by day
Elevated noise levels
More exposed to traffic noise than typical residential spots.
Night
48 dB
Loudest source
Road
Louder than 95% in the canton
Measured noise level, placed on a scale of everyday sounds.
Typical values for this region.
Hardly any elevated radon levels in the area.
Nearly all buildings
Available from 2 networks.
Frank Imoberdorf
This is a project to be seized and construction started quickly. Which explains its interesting price, taking into account a deadline for the building permit at the end of July 2027, renewable until 2030. Very well located, set back from the Sion-Nendaz cantonal road, with an unobstructed view of the surrounding mountains, year-round sunshine, and 25m from the public transport stop. The land benefits from immediate equipment and offers the possibility of using spring water.The project includes a chalet with two garages, two cellars, and a technical room in the basement. A staircase leads to each floor, where a living room with open kitchen, three bedrooms, a room with shower, and a bathroom as well as a west-facing balcony or terrace are planned.It would be quite possible to build a single dwelling or to buy the project and neighboring land with two adjacent chalets. The plot is in zone H 50.