CHF1'100'000
1893 Muraz (Collombey)·11 hr. ago
As of 09 Oct 2026
The asking price is 5.6% below the median of .
This listingCHF 1'100'000
CHF 1'165'000
Median
Is there room to negotiate?
A typical listing stays on the market for about 7 days. 0% of active listings have cut their asking price in the last 90 days. Asking prices per m² are about 4% higher than a month ago.
ARE transit class C — usable but limited service.
64% built-up area within 500 m.
Mostly couples and families with children · around 37 people in the neighbourhood.
125 %
Lower than 37% of municipalities in the canton
ESTV · 2026
Times refer to the route on foot.
Hardly any elevated radon levels in the area.
Nearly all buildings
Available from 3 networks.
Fabienne Foti
Villa No. 8 - at the end of a row, with enhanced intimacy
Located at the end of this complex of new, adjacent villas, Villa No. 8 has only one neighboring property and enjoys an unobstructed view of the Dents-du-Midi and the surrounding mountains. In a quiet residential area of Muraz, it offers 128 m² of living space (180 m² of usable space) on three levels, with a private garden, terrace, and two garage spaces - all in a high-energy-efficient construction, where you can still choose the finishes.
Ground floor - entrance and services
1st floor - day area, over 48 m²
2nd floor - night area, 3 bedrooms
For attic areas, only surfaces with a height under the ceiling of over 180 cm are counted.
Construction and energy
Heat pump, photovoltaic, and triple glazing: very low heating costs and appreciable energy independence over time.
Finishes choice - budgets included in the price
Included and options
Location
Sports center at 300 m, public transportation stop at 400 m, and shops at 600 m. The kindergarten and primary school of Muraz are about 1.2 km away, the center of Monthey and its services about 3.5 km, the train station and hospital about 3 km. The A9 highway entrance is about 10 km away, Geneva airport about 1 hour 15 minutes, and the Chablais ski resorts (Champéry, Morgins, Les Crosets) about 20 minutes.
In summary
Delivery about 15 to 18 months after the start of construction. Contact us to receive the complete dossier (detailed plans, construction description, and schedule) or to visit the site.
The interior and exterior visualizations are non-contractual computer images.