



CHF1'790/Month
9322 Egnach
On the former Mosterei Areal in Egnach, the "Perron Vert" quarter is being built. It offers a wide range of rental apartments, condominiums, offices, studios, commercial and gastronomic spaces, a care center, and senior apartments. Spacious meeting areas are planned. Tenants and condominium owners will be involved through automatic membership in the settlement association to promote the quality of living and well-being of the residents.In the first stage, a total of 64 apartments of various sizes will be offered. These apartments are distributed across the three buildings Mostereiplatz 4 (MP4), Mostereiplatz 20 (MP20), and Mostereiplatz 6/8 (MP6/8) (see "Areal-Plan" on our website www.perronvert.ch). The apartments in the MP 4 and MP 20 buildings will be built to the same standard, so the following information applies to the objects of both buildings.Features 3.5-room apartments MP 6/8:
Travel time with public transport to your saved places
Drawn from Swiss federal land-use and transit layers at the exact coordinates
