Price on request
Hardstrasse 1, 5074 Eiken·2 days ago
54% green and natural space within 500 m.
111 %
Lower than 41% of municipalities in the canton
ESTV · 2026
Times refer to the route on foot.
noise level by day
Elevated noise levels
More exposed to traffic noise than typical residential spots.
Night
48 dB
Loudest source
Road
Louder than 69% in the canton
Measured noise level, placed on a scale of everyday sounds.
Pollutant levels are below the WHO guideline.
Hardly any elevated radon levels in the area.
Nearly all buildings
Available from 3 networks.
Technopark Eiken - New construction areas for office, laboratory and industry
At Sisslerfeld, the largest life sciences cluster in the canton of Aargau, the Technopark Eiken is being built. Flexible expansible areas of around 1,212 m² to entire floors of around 1,950 m² are available - suitable for office, laboratory, production and industry. Available from 01.01.2027 or flexible according to your needs.
New building with design freedom
In the industrial area of Eiken, a representative commercial new building is being constructed in Minergie-A-Bauweise. Part of the building has already been allocated to selected tenants from the health and service sectors before completion. Those who enter now will benefit from an established, professional environment and can align their own space with operational processes during the construction phase.
Technology for demanding uses
The areas are deliberately designed to be open to use: 3.8 m room height, 1,000 kg/m² floor load, two freight elevators with a payload of 4,000 kg each and two covered truck ramps directly in the building. This makes the floors equally suitable for office and laboratory operations as well as for production and logistics. The handover takes place in the refined raw state; we realize the expansion according to individual tenant wishes, and for expansions that go beyond the raw state, the owner is willing to lend a hand.
Location with perspective
Sisslerfeld has around 3,300 specialists, and companies like Bachem and Lonza are investing in thousands of additional jobs. The feeder road to the A3 Basel-Zurich motorway is 500 m away, the SBB train station 1.2 km, and the bus stop "Industriezone Rütti" is directly in front of the building. Basel can be reached in 36 km, Zurich in 50 km, and Aarau in 22 km.
Object
Areas
Expansion and technology
Parking
Accessibility
We would be happy to provide you with the complete documentation with floor plans or show you the location on site. Contact us for a non-binding conversation.